BioInformatics Customer Support Facilities Finance Human Resources Manufacturing Materials Quality Assurance Quality Control Research & Development Advanced Systems Molecular Biology Product Development |
Doc #
|
Document Description
|
Rev #
|
Effective Date | |
Compaq Oracle® Server Installation Instructions and Qualification |
R03
|
11/29/00 | |||
Installation of New MULTIMEK™ (WINNT) |
R00
|
08/10/00 | |||
Installation of New GeSIM (Win98) |
R00
|
08/10/00 | |||
SEQUENOM MassARRAY™ Workstation Compaq ML370 Proliant Configuration Procedure |
R03
|
03/08/02 | |||
SpectroCHECK™ Client Installation Instructions |
R00
|
12/22/00 | |||
SpectroCHECK™ Customer's Site Information |
R01
|
01/25/01 | |||
Image Installation for MULTIMEK™ |
R01
|
09/19/01 | |||
Image Installation of GeSIM (Win98) |
R00
|
09/19/01 | |||
autoflex® RT Configuration |
R04
|
07/23/02 | |||
SpectroCHECK™ with SEQUENOM MassARRAY™ Workstation Compaq ML370 Proliant Configuration Procedure |
R01
|
03/08/02 | |||
RT Workstation Test Record |
R04
|
03/18/03 | |||
MassARRAY™ RT Software 3.0.0 & 3.0.1 Validation |
R00
|
10/22/02 | |||
MassARRAY™ System Manufacture v3.0.1 Validation |
R00
|
01/22/03 | |||
MassARRAY™ Typer RT v3.0.1 Patch Validation |
R00
|
01/27/03 | |||
MassARRAY™ Assay Design v2.0.4 Validation Checklist |
R01
|
03/17/03 | |||
MassARRAY™ SNP Discovery V1.2.2 Validation Checklist |
R01
|
05/07/03 | |||
MassARRAY™ OligoCHECK v2.0.4 Validation Checklist |
R00
|
04/25/03 | |||
MassARRAY™ Nanodispenser Software Upgrade v2.0.7 Validation Checklist |
R00
|
04/01/03 | |||
MassARRAY™ Services v1.1.5 Validation Checklist |
R00
|
04/10/03 | |||
MassARRAY™ RT v3.0.1 "Patch" Validation Checklist |
R00
|
04/10/03 | |||
MassARRAY™ RT v2.0 Calling Changes for Multiplex Validation Checklist |
R00
|
04/16/03 | |||
Oracle 8i Client Install 8.1.7 Validation Checklist |
R00
|
04/21/03 | |||
MassARRAY™ OligoCHECK v3.0.2 Validation Checklist |
R00
|
04/22/03 | |||
MassARRAY™ Typer v3.0.1 Service Pack 2 Validation Checklist |
R00
|
04/24/03 | |||
MassARRAY™ OligoCHECK v3.0.3 Validation Checklist |
R00
|
06/03/03 | |||
MassARRAY™ Services v1.2.1 Validation Checklist |
R00
|
06/17/03 | |||
MassARRAY™ Sample Tracking v1.1.1 Validation Checklist |
R00
|
06/19/03 | |||
MassARRAY™ OligoCHECK v3.0.4 Validation Checklist |
R00
|
08/12/03 | |||
MassARRAY™ Typer v3.1.1 Validation Checklist |
R00
|
07/30/03 | |||
MassARRAY™ Services v1.3.1 Validation Checklist |
R00
|
07/30/03 | |||
MassARRAY™ RT Workstation v3.2.1 Validation Checklist |
R00
|
07/30/03 | |||
MassARRAY™ Assay Design v2.0.5 Validation Checklist |
R00
|
08/05/03 | |||
MassARRAY™ RT Workstation v3.0.4 Validation Checklist |
R00
|
08/27/03 | |||
MassARRAY™ Services v1.2.2 Validation Checklist |
R00
|
08/27/03 | |||
Issue Tracking Form (electronic copy) |
R01
|
06/24/03 | |||
SpectroREADER™ Pre-Installation Checklist |
R01
|
07/17/01 | |||
System Suitability Determination |
R01
|
07/17/01 | |||
SEQUENOM Post-Training Questionnaire |
R00
|
09/25/01 | |||
MassARRAY™ Pre-Training Checklist |
R00
|
09/25/01 | |||
Field Service/Customer Support Report |
R01
|
04/24/02 | |||
Pre-Qualification Guide and QC Process of SpectroPOINT™ |
R03
|
07/19/01 | |||
SpectroPOINT™ Pin Functionality QC Process |
R00
|
05/07/01 | |||
SpectroPOINT™ Post Installation Acceptance Form |
R00
|
07/19/01 | |||
Customer Feasibility Study Form |
R01
|
10/11/02 | |||
SpectroJET™ 384 hME Installation Checklist |
R00
|
10/29/01 | |||
SpectroPREP™ Installation Checklist |
R00
|
05/08/02 | |||
Site Acceptance/MassARRAY™ Instrument Installation Report |
R00
|
02/06/02 | |||
Return Material Authorization Report (electronic form) |
R01
|
07/23/02 | |||
MassARRAY™ Genotype Analyzer Used System Packing Checklist |
R00
|
04/01/03 | |||
Installation Checklist for MassARRAY™ Nanodispenser |
R00
|
02/18/03 | |||
SNP Discovery: Customer Support Training Plan and Results (Engineering Released) |
RX1
|
02/18/03 | |||
Offsite Equipment Repair Request |
R01
|
06/25/02 | |||
Stamp/Signature Log |
R01
|
01/13/03 | |||
Facilities Equipment Repair Record Form |
R00
|
07/30/02 | |||
Inspection Record Air Handler AH-2 |
R00
|
01/06/03 | |||
Inspection Record Air Handler AH-3 |
R00
|
01/06/03 | |||
Inspection Record Air Handler AH-4 |
R00
|
01/06/03 | |||
Inspection Record Air Handler AH-5 |
R01
|
03/20/03 | |||
Inspection Record Air Handler AH-7 |
R00
|
01/06/03 | |||
Inspection Record Garage Exhaust EF-G1 |
R00
|
01/06/03 | |||
Inspection Record Garage Exhaust EF-G2 |
R00
|
01/06/03 | |||
Inspection Record Garage Exhaust EF-G3 |
R00
|
01/06/03 | |||
Inspection Record Mechanical Boilers, Boiler 1 |
R00
|
01/06/03 | |||
Inspection Record Mechanical Boilers, Boiler 2 |
R00
|
01/06/03 | |||
Inspection Record Domestic Boiler, Dom. B-1 |
R01
|
03/20/03 | |||
Inspection Record Industrial Boiler, Ind. B-1 |
R01
|
03/20/03 | |||
Inspection Record Fan Coil Unit CAC-1 |
R01
|
03/20/03 | |||
Inspection Record Fan Coil Unit FC 0-1 |
R01
|
03/20/03 | |||
Inspection Record Fan Coil Unit FC 0-2 |
R01
|
03/20/03 | |||
Inspection Record Fan Coil Unit FC 0-3 |
R01
|
03/20/03 | |||
Inspection Record Fan Coil Unit FC 1-1 |
R01
|
03/20/03 | |||
Inspection Record Fan Coil Unit FC 1-2 |
R01
|
03/20/03 | |||
Inspection Record Fan Coil Unit FC 2-1 |
R01
|
03/20/03 | |||
Inspection Record Fan Coil Unit FC 2-2 |
R01
|
03/20/03 | |||
Inspection Record Centrifugal Chiller, Chiller 1 |
R00
|
01/06/03 | |||
Inspection Record Centrifugal Chiller, Chiller 2 |
R00
|
01/06/03 | |||
Inspection Record Cooling Tower CT Cell 1 |
R01
|
03/20/03 | |||
Inspection Record Cooling Tower CT Cell 2 |
R00
|
01/06/03 | |||
Inspection Record Condenser Water Pumps CDWP 5 |
R00
|
01/06/03 | |||
Inspection Record Condenser Water Pumps CDWP 6 |
R00
|
01/06/03 | |||
Inspection Record Condenser Water Pumps CDWP 7 |
R00
|
01/06/03 | |||
Inspection Record Condenser Water Pumps CDWP 9 |
R00
|
01/06/03 | |||
Inspection Record Chilled Water Pumps CWP 1 |
R00
|
01/06/03 | |||
Inspection Record Chilled Water Pumps CWP 2 |
R00
|
01/06/03 | |||
Inspection Record Chilled Water Pumps CWP 3 |
R00
|
01/06/03 | |||
Inspection Record Hot Water Pumps HHWP 10 |
R00
|
01/06/03 | |||
Inspection Record Hot Water Pumps HHWP 11 |
R00
|
01/06/03 | |||
Inspection Record Hot Water Pumps HHWP 12 |
R00
|
01/06/03 | |||
Inspection Record Compressed Air Comp 1 |
R01
|
03/20/03 | |||
Inspection Record Compressed Air Comp 2 |
R01
|
03/20/03 | |||
Inspection Record Vacuum Pumps, Pump 1 |
R00
|
01/06/03 | |||
Inspection Record Vacuum Pumps, Pump 2 |
R00
|
01/06/03 | |||
Instrument Deviation Report Form (electronic form) |
R00
|
10/25/02 | |||
Instrument Status Report Form (electronic form) |
R01
|
01/13/03 | |||
Inspection Record Air Handler AH-1 |
R00
|
01/20/03 | |||
Inspection Record Process Chiller, Chiller 1 |
R00
|
01/20/03 | |||
Inspection Record Process Chiller, Chiller 2 |
R01
|
03/20/03 | |||
Inspection Record Fan Coil Unit FC 0-4 |
R00
|
03/20/03 | |||
Inspection Record Exhaust Fan EF 1 |
R00
|
03/20/03 | |||
Inspection Record Exhaust Fan EF 2 |
R00
|
03/20/03 | |||
Inspection Record Exhaust Fan EF 3 |
R00
|
03/20/03 | |||
Inspection Record Exhaust Fan EF 4 |
R00
|
03/20/03 | |||
Inspection Record Exhaust Fan EF 5 |
R00
|
03/20/03 | |||
Project Related General Item Usage (electronic form) |
R01
|
03/19/02 | |||
Timecard (electronic form) |
R00
|
02/21/02 | |||
New Hire (electronic form) |
R06
|
01/23/03 | |||
Termination (electronic form) |
R04
|
01/23/03 | |||
Occupational Injury and/or Illness Investigation |
R00
|
03/08/02 | |||
Harassment |
R00
|
04/01/02 |
|||
Temp New Hire (electronic form) |
R00
|
01/23/03 |
|||
Temp Termination (electronic form) |
R00
|
01/23/03 |
|||
IT New Hire |
R02
|
11/27/01 | |||
Matrix Applied Chip Inspection |
R04
|
06/03/03 | |||
TFI Chip Inspection |
R00
|
03/10/00 | |||
Installation / Operation Qualification |
R00
|
01/26/00 | |||
Piezo Pump Silation Inspection |
R01
|
07/09/01 | |||
New SpectroJET™ Plotter Setup Form, Manufacturing |
R00
|
08/01/01 | |||
Material Transfer Sign-Off |
R00
|
08/03/01 | |||
Hours Accounting Tracking Form |
R00
|
10/30/01 | |||
Gesim Logbook, Serial Number 9002 |
R00
|
06/02/03 | |||
Gesim Logbook, Serial Number 9042 |
R00
|
06/02/03 | |||
Gesim Logbook, Serial Number 9044 |
R00
|
06/02/03 | |||
Gesim Logbook, Serial Number 9054 |
R00
|
06/02/03 | |||
Gesim Logbook, Serial Number 9090 |
R00
|
06/02/03 | |||
Gesim Logbook, Serial Number 9089 |
R00
|
06/02/03 | |||
Radiation Safety in Restricted Areas |
R00
|
07/30/03 | |||
Seguridad de Radiacion en Areas Restringidas |
R00
|
07/30/03 | |||
Receiving Inspection |
R05
|
06/13/01 | |||
Material Request Form (electronic form) |
R05
|
05/31/03 | |||
Purchase Requisition (electronic form) |
R08
|
11/25/02 | |||
Supplier Corrective Action Request (SCAR) (electronic form) |
R01
|
03/30/01 | |||
Equipment Receiving Inspection (electronic form) |
R01
|
03/21/01 | |||
Material Relocation |
R03
|
09/25/01 | |||
Scrap Adjustment Form |
R03
|
05/25/01 | |||
Part History |
R01
|
07/14/00 | |||
Purchase Order Terms and Conditions |
R02
|
12/13/00 | |||
Packing List (electronic form) |
R01
|
06/12/01 | |||
Vehicle Mileage/Maintenance Log |
R00
|
03/16/01 | |||
New Driver Request Form |
R03
|
06/25/02 | |||
Accident Report (electronic form) |
R01
|
03/22/01 | |||
Capital Expenditure Request (CER) (electronic form) |
R03
|
04/15/02 | |||
Weekly Vehicle Maintenance Check List |
R01
|
06/12/01 | |||
Supplier Evaluation Checklist |
R00
|
09/24/01 | |||
Request for Quotation |
R00
|
05/01/01 | |||
Sequenom Hardware Qualification |
R00
|
06/13/01 | |||
Checklist MassARRAY™ Point System 120V |
R01
|
05/23/02 | |||
Checklist MassARRAY™ System hME 120V |
R01
|
05/23/02 | |||
Checklist MassARRAY™ Point System 240V |
R01
|
05/23/02 | |||
Material Completion & Return Form |
R00
|
10/11/01 | |||
Job Plate (electronic form) |
R00
|
10/10/01 | |||
Receiving Level 4 Log |
R00
|
01/28/02 | |||
Electric Lift Truck Pre-Shift Inspection Checklist (electronic form) |
R00
|
02/13/02 | |||
CHECKLIST SpectroCHECK™ Jet System autoflex® 110V |
R01
|
05/23/02 | |||
CHECKLIST MassARRAY™ OligoCHECK 7K System autoflex® 120V |
R02
|
01/30/03 | |||
CHECKLIST MassARRAY™ OligoCHECK 7K System autoflex® 240V |
R02
|
01/30/03 | |||
CHECKLIST MassARRAY™ System hME autoflex® 120V |
R01
|
05/23/02 | |||
CHECKLIST MassARRAY™ Point System autoflex® 120V |
R01
|
05/23/02 | |||
CHECKLIST MassARRAY™ Point System autoflex® 240V |
R01
|
05/23/02 | |||
CHECKLIST SpectroCHECK Jet System 110V |
R01
|
05/23/02 | |||
CHECKLIST SpectroCHECK Point System 120V |
R01
|
05/23/02 | |||
CHECKLIST SpectroCHECK Point System 240V |
R01
|
05/23/02 | |||
Shipping Request Form (electronic form) |
R00
|
04/23/02 | |||
Standard Agreement for the Supply of 2D Bar-Coded Wafers |
R00
|
02/07/03 | |||
Change Order (electronic form) |
R08
|
03/07/03 | |||
Employee Training Record |
R04
|
12/06/01 | |||
Employee Signature Log |
R02
|
06/13/01 | |||
Document Obsolete Notice (DON) (electronic form) |
R04
|
03/07/03 | |||
Deviation Notice (DN) (electronic form) |
R05
|
06/13/01 | |||
Multiple Lot Form (electronic form) |
R03
|
02/15/02 | |||
Production Router - QA Documentation |
R06
|
09/18/03 | |||
CD Line Clearance |
R09
|
01/10/03 | |||
SEQUENOM, Inc. Supplier Questionnaire |
R01
|
09/12/03 | |||
Supplier Audit Checklist (electronic form) |
R01
|
09/12/03 | |||
Market Requirements Document |
R01
|
06/13/01 | |||
Design Requirements Document |
R01
|
06/13/01 | |||
Product Proposal Document |
R01
|
06/13/01 | |||
Nonconforming Material Report (NCMR) |
R05
|
02/15/02 | |||
Training Requirements List (TRL) (electronic form) |
R01
|
04/16/02 | |||
BaaN Item Update Form |
R00
|
02/06/02 | |||
Item Number Request Form |
R02
|
09/16/02 | |||
Documentation Awareness Form |
R00
|
01/10/02 | |||
AQL Inspector's Rule Request Form |
R00
|
04/12/02 | |||
Product Hold Form |
R00
|
04/12/02 | |||
Certificate of Compliance (electronic form) |
R00
|
08/20/02 | |||
Software Certificate of Compliance (electronic form) |
R01
|
12/16/02 | |||
Software Authorization (electronic form) |
R00
|
04/02/03 | |||
Validation Checklist Template (electronic form) |
R01
|
07/28/03 | |||
Release Notes Template (electronic form) |
R00
|
06/19/03 | |||
Technical Bulletin Template (electronic form) |
R00
|
06/19/03 | |||
Customer Complaint Form (electronic form) |
R01
|
09/16/03 | |||
Licensing Notice and Certificate of Compliance, SpectroCHIP® Array Chips (electronic form) |
R01
|
07/28/03 | |||
CD Sign In Sheet (electronic form) |
R00
|
08/08/03 | |||
Software Beta Protocol/Validation (electronic form) |
R00
|
09/23/03 | |||
Quality Control Summary Report |
R00
|
10/26/00 | |||
QC Investigation Report |
R00
|
10/26/00 | |||
Acetonitrile Concentration in MALDI Matrix Solution (electronic form) |
R01
|
01/23/02 | |||
SpectroCHIP™ and/or MALDI Matrix Low Mass and Cation Contamination Testing |
R02
|
12/12/02 | |||
Quality Control Summary Report NTP Raw Material (electronic form) |
R00
|
12/13/01 | |||
Quality Control Summary Report MassEXTEND™ Mixes or dNTP Mix (electronic form) |
R02
|
03/12/03 | |||
Quality Control Summary Report hME™ Resin (electronic form) |
R00
|
12/13/01 | |||
Quality Control Summary Report SpectroCHIP™ Contamination (electronic form) |
R01
|
03/12/03 | |||
Quality Control Summary Report Matrix (electronic form) |
R02
|
03/12/03 | |||
QC Sample Login Database |
R00
|
12/19/01 | |||
HPLC Method for Determination of Purity, Identity and Concentration of NTPs |
R00
|
12/13/01 | |||
Mobile Phase A (20mM KH2PO4, pH 5.5, 5% Acetonitrile in Water) |
R01
|
03/12/03 | |||
Mobile Phase B (20mM KH2PO4, pH 3.2 10% Acetonitrile in Water) |
R01
|
03/11/03 | |||
Mobile Phase C (65% Acetonitrile, 35% Water) |
R01
|
03/12/03 | |||
ddNTP/dNTP Raw Material HPLC Concentration QC Report (electronic form) |
R00
|
12/13/01 | |||
Quality Control Summary Report Calibrant Raw Material (electronic form) |
R01
|
07/15/03 | |||
Determination of Acetonitrile Purity and Identity by Gas Chromatograph |
R00
|
01/15/02 | |||
Purity and Identity of Acetonitrile (electronic form) |
R00
|
01/15/02 | |||
Determination of Acetonitrile Concentration in SEQUENOM MALDI Matrix Solution |
R00
|
01/23/02 | |||
Mobile Phase B (60% Methanol; 40% Water) |
R00
|
01/23/02 | |||
HPLC Method for Determining Ammonium Citrate and 3-HPA Concentration in MALDI Matrix |
R00
|
01/23/02 | |||
3-HPA and Ammonium Citrate Concentration in MALDI Matrix Solution (electronic form) |
R00
|
01/23/02 | |||
Mobile Phase A (10mM KH2PO4, 0.1% TFA,
1% Methanol, 1% THF in Water) |
R01
|
03/12/03 | |||
HPLC Method for Determination of Concentration and Identity in MassEXTEND™ Mixes |
R01
|
04/03/02 | |||
Mobile Phase A (20mM CH3CO2NH4, pH 3.5 in NANOpure Water) |
R00
|
03/01/02 | |||
Mobile Phase B (20mM CH3CO2NH4, pH 5.5, 15% MeOH in NANOpure Water) |
R01
|
03/12/03 | |||
Mobile Phase C (10% Methanol; 90% Water) |
R00
|
03/01/02 | |||
EXTEND Mixes HPLC Concentration QC Report (electronic form) |
R00
|
03/01/02 | |||
Quality Control Summary Report MassEXTEND™ Mix ddGTP (electronic form) |
R00
|
05/16/02 | |||
Quality Control Summary Report Scrapie Raw Material (electronic form) |
R00
|
05/16/02 | |||
Scrapie MassEXTEND Mix HPLC Concentration QC Report (electronic form) |
R00
|
07/12/02 | |||
Purity and Identity of 3-HPA Raw Material (electronic form) |
R00
|
08/26/03 | |||
HPLC Method for Determination of Purity and Identity of 3-HPA Raw Material |
R00
|
08/26/03 | |||
Mobile Phase A (10mM KH2PO4, 0.1% TFA, 5% Methanol in Water) |
R00
|
08/26/03 | |||
Mobile Phase B (60% Methanol, 40% Water) |
R00
|
08/26/03 | |||
HPLC Method for Determination of Concentration and Identity of 3 Point Calibrant |
R00
|
03/19/03 | |||
3 Point Calibrant HPLC Concentration QC Report (electronic form) |
R00
|
03/19/03 | |||
Quality Control Summary Report for 3-Pt and 4-Pt Calibrant |
R01
|
07/15/03 | |||
HPLC Method for Determining the Purity, Identity and Concentration of SNP Discovery Cleavage Mix Raw Materials |
R00
|
03/19/03 | |||
HPLC Method for Determining the Identity and Concentration of NTPs in SNP Discovery Cleavage Mixes |
R00
|
03/19/03 | |||
Mobile Phase A (35 mM KH2PO4, 0.5% Acetonitrile, pH 3.0 in Nanopure Water) |
R00
|
03/19/03 | |||
Mobile Phase B (35 mM KH2PO4, 10% Acetonitrile, 2.0% of THF pH 3.0 in Nanopure Water) |
R00
|
03/19/03 | |||
rNTP Raw Material HPLC Concentration, Identity and Purity QC Report (electronic form) |
R00
|
03/19/03 | |||
SNP Cleavage Mixes HPLC Concentration and Identity QC Report (electronic form) |
R00
|
03/19/03 | |||
Mobile Phase C (10% Acetonitrile, 90% Water) |
R00
|
03/19/03 | |||
Mobile Phase B (20 mM NA2HPO4*7H2O, 10% Acetonitrile, in Water, 1M NaCl, pH 8.0) |
R00
|
03/19/03 | |||
Purity, Concentration and Identity of Calibrant Raw Material (5 and 10 mer) (electronic form) |
R00
|
07/15/03 | |||
HPLC Method for Determination of Identity, Concentration and Purity of 4-Point Calibrant Raw Material |
R00
|
07/15/03 | |||
Mobile Phase B (20 mM Tris, 10% Acetonitrile, 0.5 M NaCL in Water, pH 8.0) |
R00
|
07/15/03 | |||
Mobile Phase A (20 mM Tris, 10% Acetonitrile in Water, pH 8.0) |
R00
|
07/15/03 | |||
Mobile Phase A (20mM Na2HPO4*7H2O, 10% Acetonitrile in Water, pH 8.0) |
R00
|
07/15/03 | |||
Mobile Phase B (20mM Na2HPO4*7H2O, 10% Acetonitrile in Water, 1M NaCl pH 8.0) |
R00
|
07/15/03 | |||
Concentration, Purity and Identity of Calibrant Raw Material
(17 mer, 28 mer and 33 mer) (electronic form) |
R00
|
07/15/03 | |||
Calibrant UV Concentration (electronic form) |
R00
|
07/15/03 | |||
HPLC Method for Determination of Concentration, Identity and Purity of 3-Point Calibrant Raw Material |
R00
|
07/15/03 | |||
4-Channel GeSIM Nanoplotter Operation for Dispensing of PROBE Products |
R00
|
10/26/99 | |||
PROBE Reaction Processing for 96 Well Plates using MULTIMEK™ |
R00
|
10/26/99 | |||
MassARRAY™ 20K Syringe Head Validation and Calibration Checklist |
R01
|
02/20/03 | |||
MassARRAY™ 20K Solenoid Valve Validation and Calibration Checklist |
R00
|
01/16/03 | |||
MassARRAY™ 20K Resin Dispenser Validation and Calibration Checklist |
R00
|
01/16/03 | |||
MassARRAY™ 20K Thermal Cycler Validation and Calibration Checklist |
R00
|
01/16/03 | |||
MassARRAY™ 20K Nanodispenser Certification Checklist |
R00
|
01/16/03 | |||
MassARRAY™ 20K Incubator Verification Checklist |
R01
|
02/20/03 | |||
MassARRAY™ Sample Tracking v1.1.1 Beta Protocol/Validation (electronic copy) |
R00
|
09/11/03 | |||
384 Well Sample Location Map |
R01
|
03/21/01 | |||
Autoclave Log |
R01
|
03/21/01 | |||
hMC CS Quality Control Sheet (SNP Discovery v1.2) (electronic form) |
R00
|
05/21/03 | |||
Meeting Minutes (electronic form) |
R00
|
12/07/01 | |||
SpectroCLEAN™ QC Checklist |
R01
|
12/07/01 | |||
SpectroJET™ Installation Checklist |
R00
|
04/12/02 | |||
SpectroJET™ Operation Qualification Checklist |
R00
|
04/12/02 | |||
SpectroJET™ Operation Qualification Test Worksheet |
R00
|
04/12/02 | |||
Tracking Sheet Packet: 20K FAT Individual Component
Evaluation Day 2 |
R00
|
10/30/02 | |||
Tracking Sheet Packet: 20K FAT Individual Component
Evaluation Day 1 |
R00
|
11/05/02 | |||
Tracking Sheet Packet: 20K FAT Individual Component
Evaluation Day 3 |
R00
|
11/05/02 | |||
Tracking Sheet Packet: 20K FAT Individual Component
Evaluation Day 4 |
R00
|
11/05/02 | |||
SCAR Log |
R00
|
11/06/02 | |||
20K Supplier Corrective Action Report |
R00
|
11/06/02 | |||
MassARRAY™ 20K Error Reporting |
R00
|
11/06/02 | |||
20K Pre-FAT Biological Evaluation: Cocktail and TS Enzyme Dispense Station (4) |
R00
|
11/07/02 | |||
20K Pre-FAT Biological Evaluation: Cocktail and TS Enzyme Dispense Station (6) |
R00
|
11/07/02 | |||
20K Pre-FAT Biological Evaluation: hME Extend Cycle (4) |
R00
|
11/07/02 | |||
20K Pre-FAT Biological Evaluation: hME Extend Cycle (6) |
R00
|
11/07/02 | |||
20K Pre-FAT Biological Evaluation: PCR Cycle Parameters |
R00
|
11/07/02 | |||
20K Pre-FAT Biological Evaluation: Pintool (4) |
R00
|
11/07/02 | |||
20K Pre-FAT Biological Evaluation: Resin Dispense Station |
R00
|
11/07/02 | |||
20K Pre-FAT Biological Evaluation: SAP Solenoid Dispense Station (4) |
R00
|
11/07/02 | |||
20K Pre-FAT Biological Evaluation: SAP Solenoid Dispense Station (6) |
R00
|
11/07/02 | |||
20K Pre-FAT Biological Evaluation: SAP Incubation Station (4) |
R00
|
11/07/02 | |||
20K Pre-FAT Biological Evaluation: SAP Incubation Station (6) |
R00
|
11/07/02 | |||
20K Pre-FAT Biological Evaluation: Allelic Frequency - Cocktail and TS Enzyme Dispense Station (4) |
R00
|
12/02/02 | |||
20K Pre-FAT Biological Evaluation: Allelic Frequency hME Extend Cycle (4) |
R00
|
12/02/02 | |||
20K Pre-FAT Biological Evaluation: Allelic Frequency PCR Cycle Parameters |
R00
|
12/02/02 | |||
20K Pre-FAT Biological Evaluation: Allelic Frequency Pintool (4) |
R00
|
12/02/02 | |||
20K Pre-FAT Biological Evaluation: Allelic Frequency Resin Dispense Station |
R00
|
12/02/02 | |||
20K Pre-FAT Biological Evaluation: SAP Solenoid Dispense Station (4) |
R00
|
12/02/02 | |||
20K Pre-FAT Biological Evaluation: SAP Incubation Station (4) |
R00
|
12/02/02 | |||