![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
Doc #
|
Document Description
|
Rev #
|
Effective Date
|
|
Software Testing Process | R00 | 12/13/01 | |||
Bringing Down the LIMS Production Server | R00 | 02/13/02 | |||
Training Procedure, Part 1 for LIMS (Engineering Release) | RX1 | 01/17/02 | |||
biflex™ RT Configuration | R03 | 07/23/02 | |||
MassARRAY™ Link Station Sample Tracking Installation | R02 | 09/04/03 | |||
Server Configuration | R02 | 02/25/03 | |||
MassARRAY™ RT/Server/Client Sample Tracking Installation | R02 | 09/04/03 | |||
Calibration Stamp Control | R00 | 07/09/02 | |||
Control and Maintenance of Inspection, Measuring and Test Equipment, Measurement Standards and Associated Certificates | R01 | 10/21/02 | |||
Calibration Procedure for MJ Research Precision Resistors | R00 | 10/21/02 | |||
Calibration Procedure for MJ Research Temperature Probes | R00 | 10/21/02 | |||
Calibration Procedure for Balances | R00 | 10/21/02 | |||
Calibration Procedure for Freezers/Refrigerators/ Ovens/Temperature Alarms/Temperature Chart Recorders/Water Baths | R00 | 10/21/02 | |||
Calibration Procedure for Timers | R00 | 10/21/02 | |||
Calibration Procedure for Centrifuges | R00 | 10/21/02 | |||
Calibration Procedure for Model RSU Resistance Substitution | R00 | 10/21/02 | |||
Calibration Procedure for Immersion Type Thermometers | R00 | 10/25/02 | |||
Calibration Procedure for Pipettes with Nominal Value Greater Than 50µL, Repeaters and Bottletop Dispensers | R00 | 10/21/02 | |||
Offsite Equipment Repair Request | R00 | 06/04/02 | |||
Calibration Procedure for CO2 Incubators | R00 | 06/03/03 | |||
Calibration Procedure for pH Meters | R00 | 06/12/03 | |||
Calibration of Applied Biosystems 96-Well GeneAmp® PCR System 9700 | R00 | 08/12/03 | |||
Calibration of Applied Biosystems Dual 384-Well GeneAmp® PCR System 9700 | R00 | 08/12/03 | |||
Calibration Procedure for Humidity Indicators | R00 | 08/12/03 | |||
2045-001 | Installation and Maintenance of SpectroPOINT™ | R04 | 09/25/01 | ||
RT TCL Software Interface Upgrade Procedure | R00 | 08/16/01 | |||
MassARRAY™ System hME Training | R00 | 09/25/01 | |||
SpectroPREP™ Training | R00 | 09/27/01 | |||
SpectroJET™ Training | R00 | 09/27/01 | |||
SpectroPOINT™ Training | R00 | 09/25/01 | |||
SpectroREADER™ Training | R00 | 09/27/01 | |||
SpectroTYPER™ Training | R00 | 09/27/01 | |||
SpectroCHECK™ Training | R00 | 09/25/01 | |||
Installing Registry Key Controlled Software | R00 | 09/12/01 | |||
SpectroPREP™ Installation | R00 | 05/01/02 | |||
SpectroREADER™ Installation Procedures | R02 | 07/19/01 | |||
Establishing and Maintaining Customer Pricing | R00 | 10/18/01 | |||
SpectroCLEAN™ Resin Dispenser Assembly, Pre-Qualification, QC and Shipping | R00 | 02/07/02 | |||
TOF Software (Version 5.0.25) Upgrade Procedures | R00 | 12/11/01 | |||
Customer Feasibility Study Guidelines | R00 | 07/19/01 | |||
MassARRAY™ System Installation | R01 | 05/09/02 | |||
SpectroREADER™ Pre-Installation Procedures | R02 | 07/19/01 | |||
SpectroTYPER™ RT Installation Guide, biflex Version | R02 | 11/21/01 | |||
Field Service/Customer Support Reporting | R00 | 05/17/01 | |||
Use of the Site Requirement for the MassARRAY™ System Document | R01 | 05/09/02 | |||
SpectroREADER™ Networking Procedures | R03 | 09/25/01 | |||
SpectroCLEAN™ Resin Dispenser Installation and Functional Check | R00 | 02/07/02 | |||
HTP hME SpectroPREP™ Installation Guide v2.0 | R00 | 02/04/02 | |||
MassARRAY™ RT Software Installation Guide (autoflex® Version) | R02 | 03/24/03 | |||
hME SpectroPREP Installation Guide (Resin Dispenser Macros) | R00 | 02/07/02 | |||
How to Create a Sales Order in the BaaN Operating System | R00 | 06/25/02 | |||
SpectroACQUIRE Barcode Calibration Guide | R02 | 09/04/03 | |||
MassARRAY™ Genotype Analyzer (autoflex) Installation Procedures | R00 | 03/24/03 | |||
Installation and Maintenance SOP for MassARRAY™ Nanodispenser | R01 | 04/25/03 | |||
MassARRAY™ Nanodispenser S Upgrade Kit Installation Procedures | R00 | 07/25/03 | |||
MTP Hotel Troubleshooting Guide for Nanodispenser HT Unit | R00 | 07/29/03 | |||
Return Material Procedure | R00 | 07/23/02 | |||
FM - 200 Training | R01 | 08/27/02 | |||
Equipment Lockout/Tagout Procedure | R00 | 07/30/02 | |||
Mechanical Maintenance Procedure | R00 | 10/25/02 | |||
Calibration Stamp Control | R00 | 01/13/03 | |||
Calibration Procedure for Immersion Type Thermometers | R00 | 01/13/03 | |||
Standard Cost Price Update | R00 | 01/08/02 |
FM - 200 Training | R00 | 09/25/01 | |||
Termination Procedures | R00 | 06/18/01 | |||
Label Format | |||||
Gowning for Manufacturing Cleanrooms | R01 | 01/22/01 | |||
Autoclave | R01 | 10/19/00 | |||
Operation of the Fisher Accumet pH Meter | R01 | 12/15/00 | |||
Final Goods Packaging | R01 | 11/15/99 | |||
Kit Packaging Configurations | R07 | 03/01/02 | |||
Matrix Application/Pouching | R11 | 11/15/01 | |||
Line Clearance | R01 | 01/24/01 | |||
Dispensing Procedure for Bottled Reagents | R02 | 06/04/02 | |||
Labware Cleaning | R02 | 02/21/02 | |||
Dispensing Procedure for Vialed Solutions | R01 | 05/22/01 | |||
Installation / Operation Qualification (I/OQ) | R01 | 01/24/01 | |||
Label Printing | R03 | 08/28/03 | |||
Conductivity Meter | R01 | 07/20/00 | |||
Mettler Balances | R01 | 01/22/01 | |||
Chatillon Force Gauge | R01 | 07/20/00 | |||
Piezo Pump Silanation | R07 | 05/30/01 | |||
Cleaning Procedure for Plastic Chip Trays | R00 | 09/05/00 | |||
Incoming Chip Inspection using an Automated Vision System | R02 | 02/27/03 | |||
Centrifuge Evaporation (Speed Vap) | R00 | 09/14/00 | |||
Disk/SpectroCHIP™ Gluing - Red Epoxy | R01 | 02/06/01 | |||
SpectroCHIP™ Silanation - Red Epoxy | R12 | 02/25/03 | |||
SpectroCHIP™ Rework Procedure | R03 | 11/09/01 | |||
Convection Oven Operation | R00 | 11/29/00 | |||
Measurement Variation / Rounding | R00 | 12/06/00 | |||
Impact Marker Operation | R01 | 11/16/01 | |||
Matrix Application/Pouching - 300 mM | R02 | 03/12/02 | |||
SpectroJET™ Install Procedure, Manufacturing | R00 | 07/11/01 | |||
Matrix-Applied Chip Inspection Using an Automated Vision Inspection Machine | R05 | 08/28/03 | |||
Piranha Dispenser Operation | R00 | 08/07/01 | |||
Cartesian Dispenser Operation | R03 | 07/16/03 | |||
Cartesian Preventive Maintenance Procedure | R01 | 02/14/02 | |||
Shop Order Generation | R00 | 10/29/01 | |||
Enter Hours of Accounting | R00 | 02/21/02 | |||
Cartesian Degasser Operation | R02 | 03/21/02 | |||
CentriVap® DNA System Operation | R00 | 03/12/02 | |||
Packaging of Sequenom SpectroCHIP™ | R01 | 08/28/03 | |||
MassARRAY™ Nanodispenser (R) Barcode Tracking Upgrade Installation Procedure | R02 | 09/04/03 | |||
4X hME Starter Kit Packaging Procedure | R00 | 09/16/02 | |||
OEM Purification Kit Packaging Procedure | R00 | 02/20/03 | |||
Inspector Disaster Recovery Procedure | R00 | 11/20/01 | |||
5045-001
|
Part History File Procedure | ||||
Establishing Credit Account with New Supplier | R00 | 12/07/00 | |||
Cleanroom Services | R01 | 06/01/01 | |||
Central Stores Procedure | R01 | 06/01/01 | |||
Return to Supplier (RTS) Procedure | R02 | 01/28/02 | |||
Materials Receiving | R08 | 05/16/03 | |||
Office Depot Set-Up/Ordering Procedures | R01 | 06/01/01 | |||
ComDisco Ordering Procedure | R01 | 06/05/01 | |||
Purchasing Controls | R03 | 06/28/02 | |||
Incoming Quality Control (IQC) | R01 | 01/23/02 | |||
Shipping | R03 | 08/01/02 | |||
Packing of Shipment | R01 | 01/28/02 | |||
Company Van System | R02 | 06/25/02 | |||
Cycle Counting | R02 | 09/22/03 | |||
Receipt/Storage Conditions | R02 | 01/28/02 | |||
Supplier Corrective Action | R02 | 06/12/01 | |||
Supplier Evaluation/Sustaining Support | R00 | 09/24/01 | |||
Pre-Supplier Development System for SEQUENOM, Inc. | R01 | 05/22/02 | |||
Forecast Usage Activity | R00 | 10/29/01 | |||
Safety Stock Levels | R00 | 10/29/01 | |||
Physical Inventory Counts | R04 | 09/22/03 | |||
Inventory Movements and Transactions | R03 | 01/23/02 | |||
Kit Pull Procedure | R01 | 01/23/02 | |||
Shop Order Procedure | R00 | 02/21/02 | |||
Shipment of SEQUENOM C Tube Oligos in Solution by IDT | R00 | 05/01/02 | |||
Sealing and Shipping AB0862 Oligo Plates | R01 | 12/31/02 | |||
Foam-in-Place Packaging System | R00 | 06/13/02 | |||
RT Workstation Configuration | R04 | 03/25/03 | |||
Controlling Inventory Items that Expire | R00 | 03/13/03 | |||
Replenishment Order Control | R00 | 07/08/02 | |||
Samsung Techwin MassARRAY™ Nanodispenser Maintenance Manual |
R00 | 08/08/03 | |||
Samsung Techwin MassARRAY™ Nanodispenser Operations Manual |
R00 | 08/08/03 | |||
Quality Assurance Documentation Format and Style Guide | R03 | 06/27/02 | |||
Document Numbering for Quality System Documentation | R08 | 08/13/03 | |||
Deviations to Quality Controlled Documents | R01 | 01/26/02 | |||
Electronic Distribution of Controlled Documentation | R02 | 08/08/02 | |||
Electronic Numbering Log | R02 | 02/20/03 | |||
Intranet Web Site Maintenance | R02 | 02/20/03 | |||
Quality Audit Process | R02 | 08/08/02 | |||
Nonconforming Material Report | R02 | 01/23/02 | |||
CD Production for Customer Product | R03 | 02/08/03 | |||
Control of Quality Records | R02 | 02/20/03 | |||
Training Database Maintenance | R02 | 08/27/02 | |||
New Product Commercialization (NPC) Process | R00 | 07/24/01 | |||
Use of Statistical Techniques | R00 | 04/16/02 | |||
Issuance of the AQL Inspector's Rule | R00 | 04/12/02 | |||
Product Hold System | R00 | 04/12/02 | |||
Issuing Item Numbers in BaaN and performing Maintenance | R00 | 04/04/03 | |||
Instructions for CD Sign In Sheet | R00 | 08/08/03 | |||
Validation Planning | R00 | 08/13/03 | |||
Verification Planning | R00 | 08/13/03 | |||
Verification & Validation Planning | R00 | 08/13/03 | |||
Control of Documents System | R01 | 05/28/02 | |||
SEQUENOM, Inc. - Training | R02 | 08/27/02 | |||
Quality Audit | R00 | 01/25/01 | |||
Control of Quality Records | R03 | 02/18/03 |